







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateFast, Reliable ADU Builders Across Terrell Hills
If you’re weighing an ADU on your Terrell Hills lot, the two local numbers that matter most are a 110 mph wind-load roof rating and a 15-foot rear setback. Those two code points decide whether your plans pass review the first time or stall at the permit counter. We’re Seedling ADU San Antonio, and our team builds detached ADUs, JADUs, and garage conversions in Terrell Hills with written pricing before any work starts and a 365-Day Done Right Promise on every completed project. Call (210) 981-6358 to schedule a free estimate.
Why Seedling ADU San Antonio Is Terrell Hills’s Preferred ADU Builders Company

Terrell Hills homeowners regularly tell us the same thing: other builders quoted them San Antonio wind ratings and San Antonio setbacks, then got flagged by the Terrell Hills building inspector. That’s the kind of mistake that costs weeks and thousands of dollars. Our ADU Builders team knows that Terrell Hills follows the 2021 IBC with local amendments, including a 110 mph basic wind speed requirement and a 15-foot rear setback for accessory structures, not the 10-foot rule just across the boundary line.
Ben Ortega leads our Terrell Hills work personally. He walks every lot before the estimate, checks the impervious cover math against the city’s own zoning tables, and notes which existing structures on the property could convert cleanly. Clients appreciate that the crew arrives in uniforms with shoe covers and drop cloths, uses pet-safe products where there’s a choice, and sends a photo of the clean-up before leaving each day. A live person answers our phone 24/7, so a question during your build never waits until Monday.
Key Takeaways for Terrell Hills Homeowners
- Terrell Hills enforces a 110 mph wind-load roof rating, stricter than San Antonio’s 105 mph standard.
- The city requires a 15-foot rear setback for any accessory structure, including JADUs.
- Impervious cover caps on Terrell Hills estate lots often require drainage or pervious paving solutions to stay compliant.
- Every Seedling project gets a written price before work begins, with no surprise line items added later.
JADU in Terrell Hills

JADU in Terrell Hills is often the fastest path to a rentable unit on your property, because a junior accessory dwelling unit typically converts existing interior space like a finished basement, attached garage bay, or oversized utility room rather than adding new square footage. That matters on Terrell Hills lots where impervious cover limits and 15-foot rear setbacks make a detached footprint difficult, but a JADU keeps the project within the existing building envelope. A JADU conversion in Terrell Hills typically runs $90,000 to $150,000 depending on the condition of the electrical panel, bathroom plumbing, and whether you add a kitchenette.
Converting Interior Space Without Expanding the Footprint
On estates where the main house sits far back on a deep lot, the attached garage or a former maid’s quarters often provides 400 to 600 square feet of usable space. Converting that area to a JADU means no new foundation and no additional impervious cover, which keeps the project moving. The catch in Terrell Hills is that homes from the 1920s through 1950s often have outdated electrical panels and galvanized plumbing, so the budget needs a realistic allowance for those upgrades.
JADU Compliance Inside Terrell Hills Zoning
A JADU is still an accessory structure under Terrell Hills zoning, which means it counts toward the city’s lot coverage calculations. But because it doesn’t add concrete or roof area, many projects stay below the cap without needing a drainage variance. Our team calculates the impervious cover numbers before you commit to construction, so you see exactly where your lot stands.
ADU Plans in Terrell Hills
ADU Plans in Terrell Hills are where a project either succeeds or stalls before any dirt moves. The city reviews structural drawings against the 2021 IBC with local amendments, and the most common rejection we see is a plan stamped for San Antonio’s 105 mph wind speed when Terrell Hills requires 110 mph. A complete set of Terrell Hills-ready ADU plans typically costs $6,000 to $14,000 for a detached unit, depending on whether you need architectural, structural, and civil engineering sheets or can adapt a predesigned plan.
Engineering for the 110 mph Wind Load
The structural plans must show uplift strapping at every roof-to-wall connection, hurricane clips at rafter ties, and a continuous load path from roof deck to foundation. Terrell Hills building inspectors check these details on the drawings, not just in the field. We also specify products that make inspection easier: standing-seam metal roofs, engineered hold-downs, and siding systems like James Hardie HardiePanel that carry documented wind ratings.
Impervious Cover and Drainage Drawings
Terrell Hills requires site plans that show total impervious cover: roof area, driveway, walkways, patios. Many pre-1940s estate lots already sit near or above the cap because of long driveways and broad patios. When we drew plans for a garage conversion on Wiltshire Avenue, the lot measured 42% impervious before the ADU, so the plan set included pervious pavers and a 400-gallon rainwater collection system to keep the math legal. This is the level of detail Terrell Hills expects, and it’s why cheap plan sets fail review.
Trusted Brands We Service in Terrell Hills
We work directly with the brands Terrell Hills homeowners research: Tuff Shed for high-quality accessory structures, James Hardie for siding and trim that carries wind ratings and resists our humid summers, and Abodu and Cover for prefab ADUs that arrive with pre-engineered structural packages. Because we stock and coordinate around these brands, Terrell Hills clients aren’t waiting on catalog lead times or hoping a supply house can source a replacement panel. When you ask us to build with a specific product, we know its installation requirements, its documentation trail for inspection, and how it interacts with the city’s wind-load and impervious cover standards.
Common ADU Builders Problems We See in Terrell Hills Homes
- San Antonio-spec plans get flagged in Terrell Hills. Builders price a roof rated for 105 mph wind, and the city sends the drawings back demanding 110 mph. The fix usually means a new structural sheet and a week of delay before work even starts.
- Impervious cover limits are ignored until permit denial. An ADU footprint plus an existing circular driveway can push an estate lot over the cap. Terrell Hills checks this at application, not after framing begins.
- Detached garages from the 1940s lack uplift connections. Original 2×4 rafter framing with toenailed connections fails the mandatory special inspection for wind-load ties. Upgrading to engineered straps and hurricane clips is required, not optional.
- Clay soil movement cracks older foundations. Terrell Hills sits on expansive clay that shifts with moisture. ADU additions on aged slab or pier foundations often need drainage correction before new construction ties in.
Pricing for ADU Builders in Terrell Hills, TX
A detached ADU in Terrell Hills typically runs $180,000 to $320,000 for a one-bedroom unit of 500 to 700 square feet. Garage conversions range from $80,000 to $170,000, and a JADU inside the existing home footprint usually lands between $90,000 and $150,000. The local cost drivers are wind-load upgrades on the roof assembly, drainage and impervious cover compliance for the lot, and the age of the existing electrical panel and foundation. A written price from Seedling includes these items line by line before any work begins, and the 365-Day Done Right Promise covers every completed build in writing. Call (210) 981-6358 to schedule your free estimate.
We Also Serve Cities Near Terrell Hills
Our crews work throughout Terrell Hills and the surrounding communities, including San Antonio, New Braunfels, Selma, and Boerne. Each of those municipalities has its own wind-load and setback rules, and we adjust plans accordingly rather than reusing one standard approach. If you live in a nearby city and want an ADU built with the same care, call for a free estimate.
Serving Terrell Hills, TX - Our Local Coverage Area
We’re based in the Terrell Hills area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About ADU Builders in Terrell Hills

Terrell Hills requires roof assemblies rated for 110 mph basic wind speed under the 2021 IBC with local amendments. Standing-seam metal roofs, James Hardie HardiePanel siding, and engineered prefab panels from Abodu and Cover all carry documentation that satisfies this rating when installed with uplift strapping and hurricane clips. If you’re comparing quotes, ask whether the roof spec says 110 mph and whether the plans include a continuous load path detail, because that’s what the Terrell Hills inspector will look for. Call (210) 981-6358 for an exact quote on a compliant roof assembly.
Terrell Hills requires a special inspection for wind-load connections on accessory structures, not just the standard framing walk-through. The inspector verifies uplift strapping at every roof-to-wall connection, hurricane clips at rafter ties, and the full load path from roof deck to foundation. A cheap framing package that passes visual review often fails this inspection, which means tear-off and rebuild at your expense. Seedling includes the special inspection in our written price, so there’s no surprise fee when the inspector arrives.
Yes, and this is one of the most popular projects in Terrell Hills, where original detached garages from the 1920s through 1950s sit far back on deep lots. We converted a 1940s garage on Wiltshire Avenue into a one-bedroom casita while preserving the mission-style wood brackets that matched the main house. The original 2×4 rafters and lack of uplift strapping meant upgrading to a standing-seam metal roof with continuous ridge vents rated for the city’s wind load, plus James Hardie HardiePanel siding for the exterior. You keep the character, and the structure actually gets stronger than it was when it was built.
Documented wind-load compliance gives your insurance carrier proof that the new structure meets the city’s code standard, which can reduce the risk rating on your policy and help with any future wind-damage claim. In Terrell Hills, where summer storms can bring straight-line winds, an unpermitted or under-engineered ADU roof becomes a coverage problem the moment a claim is filed. We provide the structural documentation and inspection records you need to keep on file. Call (210) 981-6358 and ask about our documentation package on every build.
A JADU is subject to Terrell Hills’ impervious cover limit, but because it converts existing interior space rather than adding new roof or concrete area, it usually contributes nothing new to the lot’s impervious total. That’s why JADU projects on estate lots near the cap often move forward without a drainage variance. Our team calculates your lot’s impervious cover percentage before you sign anything, using the city’s own zoning tables for Terrell Hills, not San Antonio’s. For a free estimate on a JADU conversion, call (210) 981-6358.
Get Your Free Estimate for ADU Builders in Terrell Hills
If you’re planning an ADU, JADU, or garage conversion in Terrell Hills, call (210) 981-6358. We’ll walk your lot, check the wind-load and impervious cover numbers against the city’s actual code, and give you a written price before any work starts. The crew shows up in uniforms with shoe covers and drop cloths, uses pet-safe products where there’s a choice, and leaves a photo of the clean-up every day. Ben Ortega and the Seedling ADU San Antonio team are ready when you are.
Written by Ben Ortega, Owner at Seedling ADU San Antonio, serving Terrell Hills with written pricing and the 365-Day Done Right Promise.




